Multifamily and Commercial New Construction Checklist

Instructions:

  • All permit applications, two paper copies, and one digital copy of permit documentation should be submitted to the Development Services Department.
  • Please note at this time we accept cash or check payments (due at submittal).
  • Please email buildingpermit@lantana.org with any questions regarding your submittal.

     

 Please check to confirm submittal of the following:

  • Completed Permit Application, including a clear description of work
  • Contractor Registration Details (State License/Competency, County BTR, Liability Insurance, Worker’s Compensation) or Owner Builder Affidavit 
  • Copy of an approved drainage permit and approval letter from the Town Engineer
  • Copy of an approved Development Order for site plan and landscape plan approval from Planning and Zoning 
  • A recent survey of the property (including all improvements and easements)
  • 2 copies of the proposed plans designed in accordance with Town Code requirements, including:
    1. Approval stamp from Palm Beach County Fire Rescue
    2. Site plan of proposed new construction matching the site plan approved by Planning and Zoning
    3. All property lines, lot coverage (percent under roof), and setbacks of all improvements to property lines
    4. Location of any walls, fences, driveways, and other improvements
    5. Plans for any mechanical, electrical, roofing, gas, plumbing, etc.
    6. Finished floor elevation
    7. Energy Calculations, Soil Evaluation Report, and Photometric Plan (See Sec. 6-230 for requirements)
    8. Wall/roof section typical, elevations showing height, floor plans, and foundation/construction plans
    9. Any other relevant details related to construction or permitting on the property
  • 2 copies of all applicable product approvals (windows, roofing, doors, garage doors, shutters, etc.)

If applicable:

  • Properties in the Special Flood Hazard Area should submit a pre-construction elevation certificate.
  • If the project involves placement of fill in the SFHA, submit Lantana Fill Information Form.
  • If the project includes demolition, submit a separate building permit for project demolition.
  • If the project will require a new address, submit an address request form to Planning@Lantana.org or in person at the Development Services Department after permit approval.
  • If the project will modify a County or State road, submit PBC or DOT permits. 
  • If a new pool will be constructed, apply for a separate pool permit.

 

Notes:

  1. New construction is required to meet all Town of Lantana Code Requirements. For additional info on Code Requirements, visit https://library.municode.com/fl/lantana/codes/code_of_ordinances.
  2. All construction sites should be screened with green or black 6 ft chain link fence.
  3. No tree removal shall be permitted without an approved landscape permit.
  4. For properties in the flood zone, a during construction elevation certificate must be submitted to the Building Division prior to requesting form/slab inspections AND a final elevation certificate must be submitted prior to Certificate of Occupancy.
  5. A certified NOC is required on permits with a value of greater than $2,500 prior to scheduling an inspection. 
  6. Please note this checklist is not intended to be all-inclusive. Additional documents may be requested.