- Home
- Departments
- Development Services
- Building Permits
- Permit Applications
- A / C Changeout Checklist
A / C Changeout Checklist
Instructions
- All permit applications, two paper copies, and one digital copy of permit documentation should be submitted to the Development Services Department.
- Please note at this time we only accept cash or check payments (due at submittal).
- Please email the Building Division with any questions regarding your submittal.
Please check to confirm submittal of the following:
- Completed Permit Application, including description of work (note if an exact changeout)
- Contractor Registration Details (State License/Competency, County BTR, Liability Insurance, Worker's Compensation, Qualifier Details) or Owner Builder Affidavit
- 2 copies of the AHRI Certificate
- 2 copies of the Town of Lantana Air Conditioning Changeout Form
- 2 copies of the Tie Down Details
Also submit, if applicable:
- If the proposed A/C is not an EXACT changeout, submit 2 copies of a survey including:
- Location of the proposed unit
- Setbacks to the property line from the unit (See Ch. 23, Article V for specific zoning district)
- Elevation of the proposed unit
- If the permit is being pulled by an Owner Builder, submit:
- 2 copies of the Section 608 EPA Technician Certification
- If the project is in the Special Flood Hazard Area, submit:
- 2 copies of a signed and sealed Elevation Certificate
- If the project includes new duct work, submit:
- 2 copies of drawings of the proposed duct work
- If work is being done beyond the disconnect box, submit:
- Town of Lantana Subcontractor Application for electrical and registration details
- $30 subcontractor fee
Notes
- A/Cs are required to meet all Lantana Code requirements, including those of Chapter 6, Building and Building Regulations and Chapter 23, Zoning. For additional information on Code Requirements, visit the Code of Ordinances website.
- Mechanical equipment may not encroach in a required setback, unless the proposed unit is for the exact replacement of an existing unit.
- A certified NOC is required on A/C permits with a value of greater than $7,500 prior to scheduling an inspection.
- Please note this checklist is not intended to be all-inclusive. Additional documents may be requested.
Building Permit Submittal Checklist Instructions
-
- All permit applications, two paper copies, and one digital copy of permit documentation should be submitted to the Development Services Department.
- Please note at this time we only accept cash or check payments (due at submittal).
- Please email the Building Division with any questions regarding your submittal.
-
Building Division
Physical Address
504 Greynolds Circle
Lantana, FL 33462
Phone: 561-540-5780
Lobby Walk-In Hours
8 am to 3:30 pm
Additional Contact Information
Email the Building Official
Building Inspection Request Line: 561-540-5788